01 The Power of Design

Make Your Brand
Impossible to Miss

Three days on the show floor can do more for your brand than a year of advertising. Give those three days the stand they deserve.

02 Interior Architecture

Where Architecture
Meets Experience

We turn offices, showrooms and retail spaces into environments that motivate your team and earn the trust of your visitors.

How We Work

Turnkey in Six Steps

From the first brief to dismantling, every step has a known duration and a clear list of what we need from you. We plan backwards from your show date.

An exhibition stand built by Gera Mimarlık

We recommend starting 8-10 weeks before the show. Projects that begin in the final month either lose design detail or pick up rush costs.

  1. Day 1

    Brief and Analysis

    We go through the show, the stand area and the budget, and read the technical rules together.

  2. 3-5 Days

    Concept and 3D

    Two concept directions, presented with photoreal renders, plans and elevations.

  3. 2-4 Days

    Revision and Budget

    Revisions are applied and you get a budget broken down line by line.

  4. 2-4 Weeks

    Production and Dry Fit

    Joinery, paint and graphics run in parallel; critical parts are dry fitted in the workshop.

  5. 1-3 Days

    Transport and Build

    We build on site and hand the stand over the evening before the show opens.

  6. After the Show

    Dismantling and Storage

    We clear the space and store the reusable parts until your next show.

We Build Spaces
That Refuse
to Be Ordinary.

Gera Mimarlık brings exhibition stand design and interior architecture together under one roof. We run the process with our own team, from the first concept sketch to the last screw on site, and we do not hand the work to subcontractors.

Discover Our Story
The Gera Mimarlık production workshop and team

Designs That Leave
a Mark

Our team knows international show regulations inside out and plans every step, from first concept to final installation. One point of contact, one line of responsibility: design, production and installation are all ours.

How We Work

12+

Years of Experience

450+

Projects Delivered

15

Countries Served

98%

Client Satisfaction

Portfolio

Featured Projects

View All Projects

Clients

Brands We Work With

Maxima system exhibition stand being installed

Still have questions?

Our team is ready to go through your project requirements with you.

Good to Know

Frequently Asked Questions

For a bespoke wooden stand we recommend starting 8 to 10 weeks before the show. That gives design, revisions, production and installation a comfortable schedule. For modular or Maxima systems, three to four weeks can be enough. We can work to shorter deadlines, but design freedom narrows and rush costs come into play.

A single per-square-metre figure would be misleading, because cost is driven as much by system choice, height, finish quality, lighting, furniture and technology as by area. For the same 50 m², a bespoke wooden build and a modular stand can differ several times over. Send us the show, your stand area and a rough budget range and we will give you a realistic bracket.

A wooden stand is made entirely for you, in bespoke dimensions and forms, and gives the strongest brand presence. Modular stands (octanorm, Maxima and similar) use an aluminium structure, are reusable, go up faster and generally cost less. The right choice depends on your budget, how often you exhibit and the look you are aiming for.

Yes. On international projects we handle design, production, freight, customs (ATA Carnet) and on-site installation. Structural approval and fire certification requirements under local regulations are factored into the design from the outset.

Reply within 48 hours

Have a Project in Mind?

Send us your show dates and stand size, and we will come back with a concept direction and a budget range.